Demolition
Over 100,000 sqft of demolition services: office, lab space, racking systems.
In 2019, The WILL Group started a journey on an amazing project. You might have heard of the company, BUILT BAR. What started out as a soft rehabilitation to the old Twin Labs Facility ended in a full re-purpose with a multi-pallet rack system, drilling, food manufacturing, and an owner's eye for entertainment with an actual collegiate basketball court (to boot). We transformed a 200,000 square foot building into a BUILT facility along with what they call the 'BUILT GYM'.
01
Over 100,000 sqft of demolition services: office, lab space, racking systems.
02
Due to the client's timing needs, demolition, design, and construction occurred concurrently. Curtis Miner Architecture did a great job.
03
Built imported their food line equipment from overseas. Due to the issues with CoVid related travel, WILL was hired to coordinate the install, connection, and commissioning of equipment.
04
Project was phased and delivered in 4 phases:
P1: Food production lines
P2: Warehousing & shipping
P3: Office
P4: Gym
05
Built was a wonderful client and we enjoyed working closely with their talented team.
06
Built has won multiple architectural and design awards for the beautifully finished project.